6th March to 27th: Pre-Production.
- Everything heading up to the production of the package. Ideas, research, making the ideas form in to something more than just thoughts, costings, interview preparations, etc.
27th March to 17th April: Interviews/Preparing Script.
- I aim to use this time to record my interviews, and prepare the script. I feel that this is enough time to get the majority of interviews recorded. In terms of the script, I'd probably be better waiting until I've got the audio of the interviews before writing that; if I script it beforehand, the content of the interviews may not fit in with the planned script. So it's better to wait until after that. I feel this would be roughly enough time to do this.
23th April to 8th May: Recording Presenter, and editing package.
- This time will be used to record the presenter of my package, and edit the content of the package. Once the script is down, it will only take a few hours to record the presenter. And then the rest of the time, up until the 8th will be editing the package. I think this will be enough time to do so, as by then I'll already have a good idea of what I want it to sound like, and the content of the interviews will already been cut down to the best bit.
8th May to 22nd: Final hour-long show preparations.
- This time should be used for the final preparations of the one-hour show. By this time, everyone should of finished their packages, so we can start to time how long the show will last and the duration of everyones package. The interview for the show should already be in place.